| | | |
|
|
|
|
|
Hand spiked 30mm gauge track merges into 45mm track. Viewed: 320 times.
|
Dual gauge, hand spiked connected to Llagas Creek track. Viewed: 302 times.
|
To "test" the 30mm gauge track I regauged the Americonrad. Viewed: 301 times.
|
The Americonrad on 2' gauge! (Fn2) Viewed: 292 times.
|
| | | |
| | | |
|
|
|
|
|
New track on Eric's layout. Mark Scriviner will be making a curved switch to connect to the mainline. Viewed: 316 times.
|
3' gauge and 2' gauge. Fn3 and Fn2. The mine entrance will be reworked with a timber portal. Of course, the track will be ballasted. Viewed: 312 times.
|
IMG_0705.JPG Viewed: 273 times.
|
IMG_0708.JPG Viewed: 277 times.
|
| | | |
| | | |
|
|
|
|
|
IMG_0707.JPG Viewed: 246 times.
|
IMG_0706.JPG Viewed: 254 times.
|
IMG_0715.JPG Viewed: 274 times.
|
IMG_0714.JPG Viewed: 255 times.
|
| | | |
| | | |
|
|
|
|
|
IMG_0710.JPG Viewed: 271 times.
|
IMG_0711.JPG Viewed: 288 times.
|
IMG_0722.JPG Viewed: 269 times.
|
IMG_0717.JPG Viewed: 263 times.
|
| | | |